Assume that you have crashed a project as much as possible but that the length of the critical path is still not acceptable. What other options are available?

The assignment is to answer the question provided above in essay form. This is to be in narrative form and should be as thorough as possible. Bullet points should not to be used. The paper should be at least 1.5 – 2 pages in length, Times New Roman 12-pt font, double-spaced, 1 inch margins and utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized. Do not insert excess line spacing. APA formatting and citation should be used.